Tim Hortons Distribution Centre

by | Dec 12, 2019

Construction of a 10,000 square foot, two stories above grade office development, along with a 126,000 square foot, 125 space distribution facility in the CN South Customer Warehouse Lands (SCWL). Alsa Road Construction was proud to be apart of the road construction/asphalt paving required for the exterior and surrounding areas of the Tim Hortons Distribution Centre.
< Go Back